1.01 SECTION INCLUDES
A. Design, fabrication, and installation of one (1) vertical reciprocating conveyor (VRC) including drive unit, manual controls, gates, and enclosures as shown on project drawings and as specified herein.
1.02 RELATED SECTIONS
A. Section 03300: Cast-in-place concrete.
B. Sections of Division 16: Electrical as applicable.
1.03 REFERENCES
A. ANSI - American National Standards Institute (ANSI B20.1).
B. AWS - American Welding Society.
C. NEMA - National Electrical Manufacturer's Association.
1.04 SUBMITTALS
A. Product Data: Submit latest edition of VRC data sheet and outline drawing with the proposal.
B. Shop Drawings:
1.05 QUALITY ASSURANCE
A. Manufacturer must have a minimum of five (5) years experience in the manufacture of vertical reciprocating conveyors.
B. All structural welding performed by manufacturers must be done by welders Certified to AWS D.1.1.
C. Vertical reciprocating conveyors (VRC) are covered by ANSI/ASME B20.1 code. Manufacturer shall have over 10,000 vertical lifts installed in 50 states
D. Installer shall have the approval of the manufacturer and have a minimum of five (5) years experience in the installation of vertical reciprocating conveyors.
1.06 WARRANTY
A. The manufacturer shall warrant the VRC free of manufacturing defects beginning (30) days after shipment with the following minimums:
2.01 MANUFACTURER
A. Pflow Industries, Inc.
B. or approved equal.
2.02 VRC MECHANICAL SPECIFICATION
A. Capacity: The VRC shall be rated at a live load capacity of ______ lbs.
B. Speed: The VRC shall have a lifting speed of 15 to 20 feet per minute when loaded to capacity.
C. Vertical Travel: The VRC shall have a maximum lift height of _____ with a total of ___ operating levels.
D. Lift Platform: The VRC platform shall have a minimum of ____inches wide x ___ inches long x 84" load height with a steel deckplate and minimum 48" high welded handrails and kickplates on non-operating ends and safety chains with snaphooks on operating ends.
E. Support Columns: The VRC shall have a minimum of four (4) 6" wide flange support columns.
F. Deflection Under Load: When loaded to rated capacity, no portion of the VRC shall exhibit permanent deformations.
G. Lifting Means: Raising and lowering of the carriage shall be provided by chain over sprocket with common drive shaft connected to an efficient helical gear reducer assembly. The lifting chains shall be in a guidance assembly.
H. Safety Cams: Safety cams shall be mounted on the platform and connected directly to the lifting chains. The cams shall prevent the platform from falling more than 6" if tension is lost in the chains.
I. Safety Enclosure: Guarding on all non-operating sides of the VRC shall be by safety enclosures a minimum of 8'0" high consisting of material which will reject a ball 1/2" in diameter.
J. Floor Level Gates: Gates are required on all operating sides of the VRC at each level of operation.
2.03 VRC ELECTRICAL SPECIFICATION
A. Electric Motor:
2.04 FINISHES
A. All carbon steel surfaces shall be coated with an industrial enamel finish over primer in the manufacturers standard range of colors.
B. Prior to painting, all dirt, mill scale, oil, and grease shall be removed from carbon steel surfaces by a combination of brushing, wiping, and use of solvents.
3.01 EXAMINATION
A. Prior to commending installation of the VRC, the installer shall visually examine the conditions under which the VRC is to be installed and notify the architect in writing of conditions detrimental to the proper and time completion of the work.
3.02 INSTALLATION
A. Install the VRC, enclosures, and gates as indicated on the approved shop drawing.
B. Comply with manufacturer's detailed installation instructions when installing the equipment.
3.03 FIELD QUALITY CONTROL
A. Inspection: Upon completion of installation, the VRC shall be inspected to verify that it meets all requirements of Parts 1, 2, and 3 of this Section.
B. Tests:
3.04 ADJUSTING AND CLEANUP
A. Touch up all scratches, abrasions, and other defects in the per-finished surfaces with the same material color as that used in the factory-applied finish.
B. Remove and dispose of all rubbish and debris caused by the work under this section.
C. Verify that equipment is properly installed and guarded per ANSI/ASME B20.1.
END OF SECTION